Herbert Newman Regional Airport has two diverging runways (non-intersecting). Given the following operations and using the methodology for long-range planning, estimate hourly capacity, ASV, and minutes of annual delay in Year 10. You will need to reference the Aviation Planning textbook Chapter 5 and/or FAA AC 150-5060-5 for the methodology and FAA figures.

Herbert Newman Regional Airport

Year 10

Number of Total Annual Operations

135,000

Number of Class A Operations

50,000

Number of Class B Operations

50,000

Number of Class C Operations

35,000

Number of Class D Operations

0

Answer Questions 1 and 2 below.

Complete the worksheet below.

Aircraft

Mix

Mix Index %(C+3D)

Configuration

Capacity (Ops/Hour)

ASV (000)

Annual

Demand

(000)

Annual

Demand

ASV

Average Delay per

Aircraft (Minutes)

Minutes of Annual Delay (000)

%A

%B

%C

%D

No

Sketch

VFR

IFR

Low

High

Low

High

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

What is the ASV in Year 20 if the airport adds a third parallel runway at a parallel runway centerline-to-centerline separation of 1,200 feet? Assume the mix index in Year 20 is the same as the mix index in Year 10.